Customization: | Available |
---|---|
Frame Material: | Aluminum |
Shape: | Round |
Still deciding? Get samples of US$ 50/kg
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item Name | Garden Patio Umbrella |
Umbrella Size | 2.7m*8k,different sizes available |
Umbrella Fabric | 140g polyester/ customized fabrics |
Umbrella Frame | steel/ customized frames |
Umbrella Pole | 34/34mm steel pole |
Umbrella Ribs | 12*18mm steel ribs |
Logo | customized design |
Colors | any pantone color |
Printing Method | silk-screen or heat-transfer printing |
OEM Acceptable | Yes |
Production Capacity | 5000pcs per day |
Sample Time | 1-3days for existing sample;5-10days for new designed sample |
Production Time | 20-50days after deposit received&all the details confirmed |
Payment Terms | T/T,LC,Paypal,West Union |
Umbrella H.S Code | 66011000 |
1.Can I get samples?
Sure. We usually provide custom sample.Sample charge is depend on your request.
We usually send samples by FEDEX,UPS,TNT or DHL. If you have carrier account, it will be fine to ship with your account, if not, you can pay the freight charge to our paypal, we will ship with our account. It takes about 2-4 days to reach you, subject where you are.
2. How long is the sample lead time?
For existing samples, it takes 1-2 days. If you want your own designs, it takes 3-5 days. Anyway, we will response fast to your request.
3. How long is the production lead time?
It takes 3-7days for MOQ. We have large production capacity, which can ensure
fast delivery time even for large quantity.
4. How to pay?
1. Western Union / T/T ( Telegraphic transfer ) /L/C all acceptable
2.30% deposit and 70% before shipping all goods out is acceptable